Asbestos Removal in Manhattan Beach

Asbestos testing and removal in Manhattan Beach follow the South Coast Air Quality Management District’s Rule 1403 for the survey, the notice and the work itself. We handle the paperwork the district asks for and the removal that follows.

Nearly 6 in every 10 Manhattan Beach homes predate 1980, and one-unit homes make up 74.8% of the housing.

Request a free quote
Bathroom opened for a remodel, with the wall behind the tub cut out to the wood studs, pink and aqua tile on one wall, plastic hanging at the left and floor tile partly lifted.

How we can help

Testing

Samples from ceilings, floors and walls go to a lab, and the written report records each result. We cover this under asbestos testing and surveys.

Popcorn and textured ceilings

A sample comes before any scraping. Positive ceilings are removed in a closed-off room, as described under popcorn ceiling removal.

Flooring

Samples come from each layer of an old tile or sheet vinyl floor before a piece is lifted, with the floor tile and mastic removal page covering the work itself.

Teardowns and remodels

Taking out structure, or taking down the whole house, means the survey and the district notice before work begins. Details are on the renovation and demolition abatement page.

Manhattan Beach housing

Half of Manhattan Beach’s homes were built in or before 1970, and 14.9% of them date from before 1950. Renters hold 35.2% of the households, and 9.0% of the homes are in buildings of five or more units.

Houses and teardowns

One-unit homes are 74.8% of the housing here. A bearing wall coming out is demolition under Rule 1403, and every demolition needs the district notice.

Condos and rentals

A condo or a townhouse here is outside the single-home exemptions, since Rule 1403 says condominiums and townhouses are not residential single unit dwellings.

Permits in Manhattan Beach

Whoever applies for a demolition permit must hand the local Building and Safety a copy of the notification sent to South Coast AQMD, under state law as the district describes it. Ask Manhattan Beach’s building department about any other permit step for your address.

Upper hallway with a textured ceiling, plastic sheeting over the floor and along the walls, a wooden stair railing and a portable air machine with a hose by a window.

Frequently asked questions

Does a small remodel need a survey?

Small remodel? Only a residential single-unit dwelling can use the survey exemption, and only for a renovation removing or stripping less than 100 square feet of surface area of asbestos-containing material. Demolition never qualifies, and even a qualifying job needs a test to know the amount.

How do I vet an abatement company?

Look the company up with the Contractors State License Board and confirm the C-22 Asbestos Abatement classification or the ASB certification. Once a job reaches 100 square feet or more, Cal/OSHA registration belongs on your checklist too.

What happens to the waste?

A manifest and a licensed hauler follow friable asbestos waste, because California treats it as hazardous waste. Nonfriable material sits outside that table, but other agencies may still restrict it.

Who tests the air after removal?

Not the crew that removed the material. State law keeps contractors out of clearance air monitoring, so the air samples come from an independent consultant whom you book alongside the removal.

Owners of apartment buildings can read the El Segundo page, or go back to the front page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 588-6917

Call (424) 588-6917