Joint compound removed from a hallway before two new doors are cut in
Example project
- Home
- 1950s single-unit house in El Segundo with a short hallway to three bedrooms
- Original request
- Cut two new door openings along the hallway for a bedroom suite
- Testing
- A Cal/OSHA-certified asbestos consultant samples the joint compound and wall texture at both door spots and the hall ceiling
- Found
- Asbestos in the joint compound at both door spots
- Clear
- The wall texture and the hall ceiling
- Area
- About 70 sq ft of hallway wall
- Timeline
- Less than 100 square feet, so no district notice, then one working day
- Cost
- $1,900
In this example, a household in El Segundo is adding two doors to the hallway of a 1950s house. A renovation removing less than 100 square feet skips the district notice, and a single-unit house skips the survey requirement, but samples are still how the owners learn what the walls hold.